Skip to content

Cart

Your cart is empty

US Cabinet Hardware Schedule Template | Capramont & Co

A US cabinet hardware schedule is the controlled project record for cabinet pulls, knobs, appliance pulls, centers, finishes, quantities, rooms, drawings and approvals. Capramont & Co uses it to help US designers, architects, builders, cabinet shops and millwork teams organize British-made hardware before finish approval, submittals and made-to-order production.

US schedule control

Build one approved hardware record before a cabinet shop, builder or installer starts ordering.

Use this workflow when a US project needs cabinet pulls, knobs, cup pulls, appliance pulls, center-to-center dimensions, finish approval, quantities, spec sheets and submittal notes controlled in one place.

Interior designers Keep product, finish and room decisions visible before client approval.
Architects Connect hardware choices to drawings, elevations, schedules and submittals.
Cabinet shops Check hole spacing, centers, projection and fixing requirements before drilling.
Builders Coordinate cabinetry packages across kitchens, closets, laundry rooms and mudrooms.
What to send

Useful US project inputs before the schedule is built

A controlled schedule can start from complete construction drawings or a simple project brief. The aim is to remove ambiguity before hardware is approved for production.

Input Helpful for How it affects the schedule
Floor plans and elevations Drawings Connects each pull, knob, cup pull or appliance pull to a cabinet location, elevation or room reference.
Door and drawer counts Quantities Controls quotation counts, production quantities, client approvals and later additions.
Cabinet construction type Fit check Flags inset cabinetry, face-frame cabinetry, full-overlay doors, drawer fronts, rails and stiles before placement is fixed.
Existing hole spacing Replacement Shows whether a pull can fit existing holes or whether a custom center review is needed.
Appliance-panel notes Large pulls Separates refrigerator panels, freezer panels, tall pantry doors and appliance fronts from normal drawer pulls.
Finish direction Approval Keeps finish sample review and finish approval visible before made-to-order production.
Preferred product routes Shortlist Lets the schedule reference product pages, US Letter spec sheets and hardware type by line.
Schedule fields

Fields a US cabinet hardware schedule should control

The schedule should be clear enough for the designer, client, architect, builder, cabinet shop and installer to understand the approved hardware line without guessing.

Schedule field Required? US specification note
Project / residence name Required Keeps drawings, submittals, quotations, finish approvals and revisions tied to the correct project.
Room or zone Required Separates kitchen, pantry, closet, laundry room, mudroom, bathroom vanity, bar and whole-home cabinetry.
Drawing / elevation reference Required Connects the hardware line to a drawing, door schedule, drawer bank, appliance panel or cabinet ID.
Hardware type Required Separates cabinet pulls, knobs, appliance pulls, C pulls and cup pulls.
Product page Required Prevents substitutions and gives the team a clear Capramont product reference.
Size and overall length Required Use inches first with millimeters in parentheses where the product data is known.
Center-to-center Required for pulls Controls hole spacing, replacement fit, drawer-front drilling and custom center review.
Projection / grip clearance Recommended Useful for inset cabinetry, appliance panels, tight clearances and high-use rooms.
Finish Required Finish should be physically checked with samples before made-to-order production.
Quantity Required Controls quote count, production count, room-by-room approvals and reorder clarity.
US Letter spec sheet Recommended Gives the project team a US-format PDF reference when a verified US Letter spec sheet is available.
Approval status Required Shows whether a line is draft, revised, client-approved, cabinet-shop-approved or final.
US fit checks

Cabinetry and room conditions to check before approval

1

Face-frame cabinetry

Check rails, stiles and drawer-front proportions before locking the pull length and placement.

2

Inset cabinetry

Confirm projection, grip clearance and door swing so hardware does not conflict with adjacent fronts.

3

Full-overlay fronts

Keep centerline, edge distance and visual consistency controlled across drawer banks and doors.

4

Appliance panels

Separate refrigerator and freezer panel pulls from standard cabinet pulls because scale and load expectations differ.

5

Closets and dressing spaces

Longer pulls can help maintain a consistent whole-home rhythm across closet doors and drawer stacks.

6

Laundry rooms and mudrooms

High-use secondary spaces need the same finish, quantity and placement control as the main kitchen.

Example rows

How US schedule rows can be written

These examples show how a schedule can combine product, room, drawing reference, centers, finish and approval status. Final dimensions and quantities still need to match the approved drawings.

Area Drawing ref Hardware type Product Size / centers Finish Qty Status
Kitchen tall pantry panels K-E03 Long cabinet pull Burlington Cabinet Handle 24.5 in / 622 mm overall; 23.8 in / 604 mm centers Satin Brass 4 Finish sample required
Kitchen island drawers K-E07 Cabinet pull Westbourne Cabinet Pull 9.5 in / 242 mm overall; 8.7 in / 220 mm centers Aged Brass 8 Client review
Pantry drawer bank P-E02 Cup pull Eccleston Cup 3.8 in / 96 mm overall; 3.4 in / 86 mm centers Dark Bronze 6 Spec sheet added
Laundry room base cabinets L-E01 Cabinet pull Beaufort Cabinet Handle 6.7 in / 171 mm overall; 6.1 in / 156 mm centers Satin Stainless Steel 10 Cabinet shop review
Closet doors C-E04 Long cabinet pull Brunswick Cabinet Handle 12.2 in / 310 mm overall; 11.6 in / 295 mm centers Fine English Antique Brass 12 Draft
Bar cabinet edge detail B-E01 C Pull Westbourne C Pull 2.8 in / 70 mm overall; 2.3 in / 58 mm centers Black 6 Check edge detail
Bathroom vanity drawers V-E05 Cabinet knob Harrington Cabinet Knob 1.0 in / 25 mm diameter Medium Bronze 18 Finish approval required
US schedule rule: if existing holes, custom centers, appliance panels or non-standard custom cabinetry are involved, record the condition before the line is approved.
Product proof

Product pages and US Letter spec sheets to attach

Add product pages, images, center-to-center dimensions and verified US Letter spec sheets to schedule rows so designers, architects, builders and cabinet shops are reviewing the same hardware reference.

Beaufort Cabinet Handle for US cabinet hardware schedule proof

Beaufort Cabinet Handle

Use for cabinet-pull rows where overall length, centers and finish approval need a clear product reference.

Overall: 4.2–14.9 in / 107–379 mm Centers: 3.6–14.3 in / 92–364 mm center-to-center
Westbourne Cabinet Pull for US center-to-center schedule rows

Westbourne Cabinet Pull

Use for drawer, door and feature cabinetry rows where a linear pull needs center and finish control.

Overall: 4.5–15.4 in / 114–392 mm Centers: 3.6–14.3 in / 92–364 mm center-to-center
Westbourne C Pull for edge detail and schedule approval

Westbourne C Pull

Use for C-pull rows where the edge detail, hole spacing and placement need to be confirmed before drilling.

Overall: 1.7, 2.3, 2.8 in / 44, 58, 70 mm Centers: 1.3, 1.8, 2.3 in / 32, 46, 58 mm center-to-center
Brunswick Cabinet Handle for whole-home US hardware schedules

Brunswick Cabinet Handle

Use for longer pull rows in closets, whole-home cabinetry and taller cabinet doors where consistency matters.

Overall: 6.7–27.2 in / 170–690 mm Centers: 6.2–26.6 in / 158–675 mm center-to-center
Burlington Cabinet Handle for appliance panel and tall cabinet schedule rows

Burlington Cabinet Handle

Use for tall cabinet, pantry and appliance-panel rows where longer pulls and centers need schedule control.

Overall: 4.1–24.5 in / 104–622 mm Centers: 3.6–23.8 in / 92–604 mm center-to-center
Eccleston Cup pull for US drawer schedule rows

Eccleston Cup

Use for drawer banks where cup-pull width, placement, center-to-center dimensions and finish need approval.

Overall: 2.4, 3.8, 5.8 in / 60, 96, 148 mm Centers: 2.0, 3.4, 5.4 in / 50, 86, 138 mm center-to-center
Finish approval

Keep finish samples and approvals inside the schedule.

A US hardware schedule should show the selected finish, the physical sample route and whether approval is still pending. This is especially useful when the client, designer, architect, builder and cabinet shop all need the same final decision.

Finish sample requested Record the sample route before the finish is treated as approved.
Room lighting checked Review finish decisions against kitchen, closet, bathroom vanity, laundry room and mudroom lighting conditions.
Approval status updated Mark each line as draft, under review, client-approved, cabinet-shop-approved or final.
Workflow

From project intake to approved hardware record

1

Send the project inputs

Share drawings, elevations, door counts, room lists, product ideas, finish direction or an existing hardware list.

2

Separate room and cabinet types

Record kitchen, pantry, closet, laundry room, mudroom, bathroom vanity, appliance panel and whole-home lines clearly.

3

Check centers and fit

Review center-to-center dimensions, hole spacing, projection, grip clearance and any custom center requirements.

4

Attach product proof

Add product pages, images, US Letter spec sheets and finish sample routes where relevant.

5

Track revisions

Keep substitutions, quantity changes, finish decisions and drawing updates visible to the project team.

6

Approve before production

Use the approved schedule to support quotation, made-to-order production and later reorders or additions.

Route choice

Choose the right US specification route

Use the route that matches the stage of the project. A schedule is most useful when hardware choices need to be controlled across several rooms or approving parties.

Route Use it when Best next step
US Specification Center You need the main route for samples, finish approval, product proof, custom centers and project support. Open US Specification Center
Project review You want Capramont to review drawings, elevations, door counts, product ideas or an early hardware list. Review project details
Hardware Schedule You want one controlled record for products, centers, finishes, quantities, rooms, submittals and approvals. Start a Hardware Schedule
Spec pack / submittal You need product references, US Letter spec sheets and technical notes ready for project approval. Build a spec pack
Trade access You are a qualifying interior designer, architect, builder, cabinet shop, millwork team or project-led buyer. Apply for Trade Access
US answers

Common US hardware schedule questions

What is a cabinet hardware schedule?

A cabinet hardware schedule is the controlled project record for products, sizes, center-to-center dimensions, finishes, quantities, rooms, drawing references, spec sheets and approval status before ordering.

Who should use a Hardware Schedule?

Interior designers, architects, builders, cabinet shops, millwork teams and project-led buyers should use a schedule when a project has multiple rooms, revisions, finish decisions or approving parties.

Why does center-to-center matter?

Center-to-center controls the distance between fixing holes. It matters for drawer-front drilling, replacement projects, existing hole spacing, custom centers and appliance-panel coordination.

Should appliance pulls be scheduled separately?

Yes. Appliance panels, refrigerator panels and tall cabinet panels should be listed separately because their scale, placement and center requirements can differ from standard cabinet pulls.

Can finish approval be tracked in the schedule?

Yes. Finish sample status should be recorded in the schedule so the project team knows whether the finish is draft, under review, client-approved or final before made-to-order production.

Do US projects need US Letter spec sheets?

US Letter spec sheets are useful for submittals and project packs when they are available. Product pages should also be linked so the team can check product imagery and specifications.

Start the record

Send the drawings, counts or product ideas you already have.

Capramont can use project drawings, room lists, appliance-panel notes, finish direction, product shortlists and existing hole spacing to help organize a US cabinet hardware schedule.