Samples & Sign-Off

Finish approval

Approve the finish before the order is released to production

Finish sign-off is the control point between choosing a cabinet hardware finish and manufacturing the order. It gives the studio, designer, joiner, client or project team a physical reference before made-to-order production begins.

Physical finish check Review the finish beside cabinetry, paint, timber, stone, lighting and surrounding metalwork.
Made-to-order control Use the approved sample as the finish reference before the order moves into production.
Project record For larger projects, record the approved finish with the quotation, project enquiry or Hardware Schedule.
Approval route

Choose the right approval route

Use the simplest route that matches the stage of the project. A known finish can move directly to physical sign-off, while broader finish, material, product or project decisions should use the relevant specification and review route first.

1

Known finish

Use a Finish Sign-Off Knob when one chosen finish needs physical approval before the order is released.

Order sample
2

Heritage comparison

Narrow the Heritage finish direction with the finish and cabinetry guidance, then order one Finish Sign-Off Knob for final physical approval.

Compare finish direction
3

Specialist material

Use Project & Drawing Review when the decision involves Atelier materials, higher-wear applications or project-specific performance questions.

Request project review
4

Project approval

Use the Hardware Schedule or project review route when several rooms, product types, finishes or approving parties are involved.

Start hardware schedule
Workflow

The finish sign-off workflow

For made-to-order hardware, finish approval should happen before final production release, not after the order has already been committed.

Shortlist the product route Choose the likely collection, hardware type or product family first.
Select finish family Decide whether the project is Heritage-led or requires Atelier review.
Choose approval route Order the Finish Sign-Off Knob for final physical approval, or use the relevant guide, project review or schedule route first.
Check with real materials Compare against cabinetry, paint, timber, stone and lighting.
Record the approval Add the approved finish to the quotation, enquiry or Hardware Schedule.
Release for production Once confirmed, the made-to-order hardware can move forward with less risk.
Decision table

When each approval route is best

Buyer stage Best route Use when Next step
Finish already chosen Finish Sign-Off Knob One finish needs physical approval before made-to-order production. Order sample
Several Heritage finishes under review Finish & Cabinet Colour Matching The studio or client needs to narrow the Heritage finish direction before ordering the final physical sign-off sample. Compare finishes
Specialist finish or material question Project & Drawing Review The project needs Atelier, material-performance or project-specific finish review before order. Send details
Early product and scale choice Hardware Finder The project is still comparing product type, physical form, grip, diameter, proportion or scale. View Hardware Finder
Studio or project presentation Hardware Schedule Several products, finishes, rooms or approving parties need one controlled project route. Start schedule
Finish families

Heritage and Atelier sign-off

Heritage finishes are the standard finish route for most cabinetry projects. Atelier materials are more specialist and may need closer review where performance, material, project value or lead-time sensitivity matters.

  • Use Heritage sign-off for brass, bronze, black, satin brass and stainless-led selections.
  • Use Atelier review where the decision involves specialist metals, higher-wear areas or project-specific material questions.
  • Use project enquiry when the finish decision affects several rooms, a schedule or a client approval pack.
Project control

When to send details instead of ordering one sample

Send project details when the finish is connected to drawings, elevations, quantities, custom centres, multiple hardware types or several approving parties.

  • Drawings, elevations, door counts or an existing hardware schedule.
  • Client presentation, multi-room project or whole-home finish consistency.
  • Custom centres, appliance pulls, bespoke sizing or finish uncertainty.
Specification proof

Proof available before ordering

Use samples, product pages, product imagery, project routes and schedule support together before confirming the finish or specification.

Sample

Finish Sign-Off Knob

Primary physical approval route before made-to-order production.

View sample
Finder

Hardware Finder

Use product routes to compare hardware type, form, proportion and scale before final finish sign-off.

View Hardware Finder
Guide

Finish & Cabinet Colour Matching

Use before sign-off to narrow finish direction by cabinetry colour, timber and style.

Read guide
Project

Project & Drawing Review

Use when finish approval is tied to drawings, schedules, quantities or elevations.

Send project / drawing
Schedule

Hardware Schedule

Record products, sizes, finishes, quantities, rooms and approvals in one controlled project route.

Start schedule
Product proof

Product routes for finish and specification checks

Use product pages to check product form, scale, size routes, finish presentation and available specification information before ordering.

Product route Use in sign-off Best next step
Harrington Cabinet Knob Useful knob reference for finish, diameter, scale and client approval. View product
Westbourne Cabinet Pull Useful pull-handle reference for finish, proportion and product specification. View product
Beaufort Cabinet Handle Useful bar-handle reference for finish, scale and project specification. View product
Burlington Cabinet Knob Useful traditional knob reference for Heritage-led schemes. View product
Varndell Cabinet Knob Useful classical knob route for physical finish and scale approval. View product
Risk reduction

Common finish sign-off mistakes to avoid

Mistake Why it creates risk Better route
Approving from screen photography only Screen colour, lighting and finish texture can differ from the real scheme. Order a physical finish sign-off sample.
Checking the sample away from cabinetry The finish may read differently beside the real paint, timber, stone or lighting. Review the sample beside the actual project materials.
Leaving approval until production release Late finish changes can delay a made-to-order project. Confirm the finish before final order approval.
Not recording the approved finish Designers, joiners, clients and ordering teams may work from different references. Add the finish to the quotation, project enquiry or Hardware Schedule.
Questions

Finish sign-off FAQs

These FAQs answer common finish approval questions for buyers, designers, studios and joiners before made-to-order production.

What is finish sign-off?

Finish sign-off is the physical approval of the selected cabinet hardware finish before made-to-order production begins. It gives the client, designer, studio or joiner a real finish reference before the order is released.

Do I need a finish sample before ordering?

A finish sample is recommended when the finish is client-facing, the order is made to order, or several rooms need a consistent hardware finish. It is especially useful for kitchens, wardrobes and whole-home projects.

Can I approve a finish from website images?

Website images are useful for shortlisting, but physical approval is safer before production. A finish can read differently beside painted cabinetry, timber, stone, appliances and warm or cool lighting.

When should I send project details?

Send project details when the finish decision affects more than a single product choice. This is best for drawings, elevations, door counts, custom centres, appliance pulls, several rooms or multiple approving parties.

Can finish approval be recorded in a Hardware Schedule?

Yes. For project-led work, the approved finish can be recorded with the products, sizes, quantities, rooms and approval notes in a Hardware Schedule.

Ready to approve the finish?

Use a physical sign-off sample before made-to-order production, or send the project details if the finish decision needs to be reviewed with drawings, quantities, products or a Hardware Schedule.