A cabinet hardware schedule template is a controlled project record for handles, knobs, appliance pulls, C pulls and cup pulls. Capramont & Co uses Hardware Schedule support to organise product names, sizes, centre-to-centre measurements, finishes, quantities, rooms, drawings, tear sheets and approval status before British-made cabinet hardware goes into made-to-order production.
A cabinet hardware schedule is the controlled project record that connects drawings, elevations, product choices, centre-to-centre sizes, finishes, quantities, tear sheets and approval status before made-to-order production.
The schedule should make every important hardware decision visible: product, room, drawing reference, hardware type, size, centre-to-centre, finish, quantity, proof and approval status.
| Schedule field | Required? | Why it matters |
|---|---|---|
| Project name | Required | Keeps drawings, quotations, schedules and approvals tied to the correct project. |
| Room / zone | Required | Separates kitchen, pantry, utility, wardrobe, dressing room, bar and other joinery areas. |
| Drawing / elevation reference | Required | Connects each hardware line to a plan, elevation, door count or unit reference. |
| Hardware type | Required | Separates cabinet handles, knobs, appliance pulls, C pulls and cup pulls. |
| Product name | Required | Prevents vague substitutions and keeps the selected Capramont product clear. |
| Size / overall length | Required | Controls visual scale, product route and placement decisions. |
| Centre-to-centre | Required for pulls | Controls drilling, replacement suitability and joinery coordination. |
| Finish | Required | Should be physically checked before made-to-order production. |
| Quantity | Required | Controls quotation, production count, revisions and reorders. |
| Tear-sheet link | Recommended | Gives the joiner, designer and client a technical reference. |
| Approval status | Required | Shows whether a line is draft, revised, client-approved, joinery-approved or final. |
| Revision notes | Recommended | Tracks changes, later additions and repeat-order continuity. |
These rows show how different product types can be recorded across a project. Final sizes, quantities, centres and finishes should always be checked against the live drawings and approved project requirements.
| Area | Drawing ref | Hardware type | Product | Size / centres | Finish | Qty | Status |
|---|---|---|---|---|---|---|---|
| Kitchen tall units | K-E03 | Long pull | Burlington Cabinet Handle | 622mm overall / 604mm centres | Satin Brass | 4 | Finish sample required |
| Island drawers | K-E07 | Pull | Westbourne Cabinet Pull | 242mm overall / 220mm centres | Aged Brass | 8 | Client review |
| Pantry drawers | P-E02 | Cup pull | Eccleston Cup | 96mm overall / 86mm centres | Dark Bronze | 6 | Tear sheet added |
| Utility base units | U-E01 | Pull | Beaufort Cabinet Handle | 171mm overall / 156mm centres | Satin Stainless Steel | 10 | Joiner review |
| Wardrobe doors | W-E04 | Long pull | Brunswick Cabinet Handle | 310mm overall / 295mm centres | Fine English Antique Brass | 12 | Draft |
| Bar cabinet | B-E01 | C Pull | Westbourne C Pull | 70mm overall / 58mm centres | Black | 6 | Check edge detail |
| Dressing room | D-E05 | Knob | Harrington Cabinet Knob | 25mm | Medium Bronze | 18 | Finish sign-off required |
Record product name, overall length, centre-to-centre, finish, quantity and room location for each pull-handle line.
Record the appliance or tall-unit location, fixing centres, panel reference and quantity. Do not treat these as generic handles.
Record position, overall size, centres and edge detail. These product types need clear placement control.
Record diameter or size, finish and quantity. Knobs are often repeated across doors, drawers and secondary spaces.
Record whether the finish was physically reviewed and approved before made-to-order production.
Record substitutions, quantity changes, centre changes and finish decisions so the final order matches the approved version.
Use PDP imagery, specification sheets, finish samples and project review to check scale, fixing centres, finish direction and approval status before ordering.
Pull-handle rows with visible overall length and centre-to-centre control.
Linear pull route for drawers, doors, Art Deco-led schemes and feature joinery.
C-pull and finger-pull rows where edge location and centre control matter.
Long-pull route for wardrobe, tall-unit, dressing room and whole-home schedules.
Tall-unit and appliance-scale pull rows where long centres must be controlled.
Cup-pull drawer rows where position, width and centre measurements need approval.
Finish approval should not sit outside the project record. The schedule should show which finish has been selected, which physical sample route was used and whether approval is still outstanding before made-to-order production.
Send drawings, elevations, door counts, product shortlists, finish questions or an existing schedule.
Products, hardware types, sizes, centres, finishes and any custom-centre requirements are reviewed.
Each line is organised by room, drawing reference, product, size, centres, finish, quantity and status.
PDP links, product images, tear sheets and sample routes are attached where relevant.
Changes are tracked so the team knows which product, finish and quantity version is approved.
Once approved, the schedule can support quotation, production and trade/project ordering where suitable.
These routes are connected, but they should be used at different stages of the project.
| Route | Use it when | Best next step |
|---|---|---|
| Project & Drawing Review | You want Capramont to review drawings, elevations, door counts, finish questions or an existing schedule. | Send Project / Drawing |
| Start a Project Enquiry | You have an early project, quotation request, repeat order, bespoke question or product shortlist. | Start a Project Enquiry |
| Start a Hardware Schedule | You want one controlled record for products, sizes, centres, finishes, quantities, rooms and approvals. | Start a Hardware Schedule |
| Trade Access | You are a qualifying studio, joiner, cabinet maker, designer, architect or project-led buyer. | Apply for Trade Access |
A cabinet hardware schedule is a controlled record showing the selected products, sizes, centre-to-centre measurements, finishes, quantities, rooms, drawing references and approval status before ordering.
Kitchen studios, joiners, cabinet makers, interior designers, architects and project teams benefit when a project has multiple rooms, finishes, drawings, revisions or approving parties.
A good schedule should include room, elevation, unit reference, hardware type, product name, size, centres, finish, quantity, tear-sheet link, approval status and revision notes.
No. Small straightforward orders can often be handled through normal product selection. A Hardware Schedule is most useful for multi-room, bespoke, trade or project-led work.
Yes. Capramont & Co can review drawings, elevations, door counts and product choices to support a controlled Hardware Schedule before made-to-order production.
Yes. Finish sign-off should be recorded before production, especially where several stakeholders must approve the hardware finish under real project lighting.
Yes. Non-standard centres, replacement holes and bespoke joinery conditions should be recorded clearly and reviewed before final order confirmation.
Yes. Tear-sheet links help joiners, designers and clients check dimensions, centres and product details against the approved schedule.
Drawings, elevations, door counts, existing schedules, finish direction, product shortlists and custom-centre notes can all be used to start a controlled Hardware Schedule.